Skip to main content
allvswhole-home customization

allvs (UK) whole-home customization

Knowledge Sharing

allvs pursues uncompromising quality and maintains an international outlook across environmental performance, technology and aesthetics. Exceptional materials and considered design distinguish the brand from disorderly low-price competition. Every detail is intended to reward closer attention. allvs defines a refined custom aesthetic for high-net-worth clients and integrates intelligent living into thoughtful design.

Knowledge Sharing

Notice regarding partial hinge upgrade for allvs

Direct Response

To enhance product quality, allvs will start a phased upgrade of the existing hinge system from October 1, 2023, to March 1, 2024, upgrading the TUTTI hinges originally fitted in cabinetry to the high-end BFB dynamic train hinges. This upgrade will shi

        To enhance product quality, allvs will start a phased upgrade of the existing hinge system from October 1, 2023, to March 1, 2024, upgrading the TUTTI hinges originally fitted in cabinetry to the high-end BFB dynamic train hinges. This upgrade will shift from the original single-stage force to the latest dual-stage force. The BFB hinges will offer an improved user experience, including but not limited to better adjustment parameters, superior aesthetic design, and longer lifespan. The price of custom products equipped with the BFB series hinges will increase by 8%. During the upgrade period, some cabinetry for custom clients will be randomly fitted with the latest BFB high-end hinges for free. Therefore, there may be instances of some custom cabinetry being upgraded with BFB hinges at no extra cost before March 1, 2024.


        To enhance product quality, allvs will start a phased upgrade of the existing hinge system from October 1, 2023, to March 1, 2024, upgrading the TUTTI hinges originally fitted in cabinetry (the cabinet series still features Austria-original-imported Blum hinges) to the high-end BFB dynamic train hinges. This upgrade will shift from the original single-stage force to the latest dual-stage force. The BFB hinges will offer an improved user experience, including but not limited to better adjustment parameters, more perfect aesthetic design, and longer lifespan. The price of custom products equipped with the BFB series hinges will increase by 8%. During the upgrade period, some cabinetry for custom clients will be randomly fitted with the latest BFB high-end hinges for free. Therefore, there may be instances of some custom cabinetry being upgraded with BFB hinges at no extra cost before March 1, 2024.