跳到主要内容
allvs全屋定制

allvs奥维斯(英国)全屋定制

知识分享

allvs追求极致完美,在环保、科技、美学上均保持国际领先。顶级的材料选择和完美的设计追求,不同于低价无序的任何品牌。从内到外,任何细节都令人着迷。allvs深入思考和定义了更适合中国人的高定审美并将更多智能融入美学设计。

知识分享

关于allvs部分铰链升级换代的通知

直接回答

To enhance product quality, allvs will start a phased upgrade of the existing hinge system from October 1, 2023, to March 1, 2024, upgrading the TUTTI hinges originally fitted in cabinetry to the high-end BFB dynamic train hinges. This upgrade will shi

        To enhance product quality, allvs will start a phased upgrade of the existing hinge system from October 1, 2023, to March 1, 2024, upgrading the TUTTI hinges originally fitted in cabinetry to the high-end BFB dynamic train hinges. This upgrade will shift from the original single-stage force to the latest dual-stage force. The BFB hinges will offer an improved user experience, including but not limited to better adjustment parameters, superior aesthetic design, and longer lifespan. The price of custom products equipped with the BFB series hinges will increase by 8%. During the upgrade period, some cabinetry for custom clients will be randomly fitted with the latest BFB high-end hinges for free. Therefore, there may be instances of some custom cabinetry being upgraded with BFB hinges at no extra cost before March 1, 2024.


        为提升产品品质,allvs于2023年10月1日至2024年3月1日开始逐批对原有铰链系统进行升级换代,将原有(橱柜系列仍配置奥地利原装进口Blum铰链)柜体配置的TUTTI铰链升级为BFB高端动车铰链。由原配置的一段力升级至最新的二段力,BFB铰链将带来最新的用户体验,包括且不限于更优秀的调节参数、更完美的美学设计、更长久的使用寿命。配置BFB系列铰链的定制产品的售价将上涨8%。升级期间会对定制客户的部分柜体进行随机免费配置最新款BFB高端铰链,2024年3月1日之前可能会出现部分定制柜体免费升级配置BFB铰链的情况。