Skip to main content
allvswhole-home customization

allvs (UK) whole-home customization

About us

Learn about allvs's brand positioning, space philosophy, manufacturing and delivery information.

allvs (UK) whole-home customization

Brand Introduction

allvs is a British brand that officially entered the Chinese market in 2022. Its aesthetic design headquarters is based in London. Its joint-venture processing centres in Shanghai, Guangzhou and Linyi, China, use German-imported production lines for advanced processes including imported decorative-surface lamination, fully automated powder coating and laser edge banding. They also provide OEM manufacturing for several mid- to high-end domestic brands. In 2010, allvs joined the global building materials alliance IUMRS. Its independent supply chain includes leading hardware suppliers such as Austria's Blum, Germany's Hettich, Italy's TUTTI (now under Chinese ownership) and Italy's Salice, together with leading panel suppliers including Austria's EGGER, Germany's Kronospan, Brazil's BERNECK and Italy's Cleaf. allvs uses environmentally compliant materials that meet Japan's F4-star and China's ENF standards. Before delivery, all materials undergo secondary testing with a US-imported INTERSCAN 4160 formaldehyde detector. In 2023, allvs expanded into smart home systems, launching smart kitchens, smart appliances and whole-home water purification.

allvs 厂房门头
allvs 厂房门头

Brand endorsement

Seeing allvs from factory, exhibition to showroom

Judgments about allvs come not just from a brand introduction, but from the visible evidence formed by signage, exhibitions, showrooms, supply chain and real material spaces together.

allvs factory signage
allvs factory signageModern factories and clear brand signage, carrying the delivery foundation of whole-home customization from design to manufacturing.
International Exhibition Site
International Exhibition SiteThrough exhibition exchanges, material displays, and design trend observations, the brand maintains an international perspective.
Showroom and Brand Ambassador
Showroom and Brand AmbassadorThe brand ambassador and showroom space together present allvs's aesthetics, materials, and lifestyle for discerning consumers.
Global Supply Chain
Global Supply ChainFrom panels, hardware, finishes, equipment to lighting systems, continuously emphasizing verifiable materials and supply chain foundations.

Brand Video

Discover allvs

allvs brand introduction

Starting from brand positioning, spatial aesthetics, and high-end customization methods, presenting allvs's overall image.

allvs OSB material description

Focusing on materials, structure, and usage scenarios to explain the value of OSB in whole-home customization.

Brand Approach

Guided by the principles of being understandable, verifiable and deliverable

01

People-Oriented

Spatial solutions first serve the living habits, movement paths and long-term storage needs of the residents.

02

Information Transparency

Materials, craftsmanship, pricing and delivery milestones are clarified as much as possible in the form of lists and contracts.

03

Long-Term Use

Focus on dimensional accuracy, structural stability, hardware experience, maintenance convenience and after-sales response.