Skip to main content
allvswhole-home customization

allvs (UK) whole-home customization

Factory

allvs pursues uncompromising quality and maintains an international outlook across environmental performance, technology and aesthetics. Exceptional materials and considered design distinguish the brand from disorderly low-price competition. Every detail is intended to reward closer attention. allvs defines a refined custom aesthetic for high-net-worth clients and integrates intelligent living into thoughtful design.

Latest German Homag six-sided drilling production line

Factory

Latest German Homag six-sided drilling production line

Advanced Production Line

Six-sided drilling completes multi-face drilling, grooving, and connection processing in a single positioning.

Update date
Book whole-home plan

The illustration shows the official HOMAG DRILLTEQ H-330 equipment diagram, not an actual allvs factory photo.

Single positioning reduces repeated errors

The six-sided drilling production line completes drilling, grooving, and connection processing on multiple panel surfaces through CNC clamping and coordinate machining, reducing errors from manual panel flipping and multiple positioning.

More accurate connection structures

Precise hole positioning directly affects the assembly quality of embedded components, hinges, shelves, and connectors. After connecting production data with detailed drawings, it improves panel matching, on-site installation, and subsequent adjustment efficiency.