Skip to main content
allvswhole-home customization

allvs (UK) whole-home customization

Products

allvs pursues uncompromising quality and maintains an international outlook across environmental performance, technology and aesthetics. Exceptional materials and considered design distinguish the brand from disorderly low-price competition. Every detail is intended to reward closer attention. allvs defines a refined custom aesthetic for high-net-worth clients and integrates intelligent living into thoughtful design.

Products

gaming space

Latest Project

allvs whole-home high-end customization - gaming space

Book whole-home plan

A gaming space isn't just equipment stacking, but a complete system of display, acoustics, lighting, thermal management, storage, and two-person collaboration. allvs plans desktops, main units, speakers, cables, and storage based on equipment dimensions and usage posture, allowing high-performance equipment to naturally enter residential spaces.

Immersive, but not noisy

One to two curved displays, professional main unit and speaker system arranged around viewing distance and sound field, sound-absorbing walls, adjustable lighting, and independent thermal management make extended use more comfortable. Restrained cyberpunk details preserve personality while not disrupting the overall home aesthetic.

Design starting from power and thermal management

Confirm equipment power, network, outlets, lighting control, and ventilation paths before electrical and plumbing work. Design cabinets and brackets based on actual loads, and reserve space for future upgrades.