Skip to main content
allvswhole-home customization

allvs (UK) whole-home customization

Knowledge Sharing

allvs pursues uncompromising quality and maintains an international outlook across environmental performance, technology and aesthetics. Exceptional materials and considered design distinguish the brand from disorderly low-price competition. Every detail is intended to reward closer attention. allvs defines a refined custom aesthetic for high-net-worth clients and integrates intelligent living into thoughtful design.

Knowledge Sharing

Save tens of thousands on renovation! 2025 National Subsidy for Home Renovation now open nationwide, last year for limited-time subsidies! Policy upgraded! Up to 47,000 yuan in national subsidies!

Direct Response

The government is giving money for home renovations, and this year it's even more generous! The 2025 national subsidy for home renovation "Green Living 2.0" has been completely upgraded. From now until December 31, residents across the country renovating new or existing homes can enjoy up to 47000 yuan in dual-direction cash subsidy plus a smart home package! Government support, brand collaboration, dual upgrades in environmental protection and technology, helping you easily create a high-quality healthy home! Four core benefits in 2025, save money with peace of mind! 1. Double the subsidy, get money faster ✅ Subsidy targets: All

         Government funding for home renovation, bigger support this year! 2025 National Subsidy for Home Renovation 'Green Living 2.0' completely upgraded

         From now until December 31st, nationwide residents renovating new homes or remodeling old ones can enjoy up to 47,000 yuan in government-enterprise dual cash subsidies + smart home gift pack! Government boost, brand collaboration, dual upgrade in environmental protection and technology, helping you easily create a high-quality healthy home!


          2025 Four Core Benefits, save more and stay assured! 

          

          1. Doubled subsidies, faster payments 

        ✅ Subsidy recipients: Nationwide property owners (including new and second-hand housing) 

        ✅ Subsidy standards: Basic subsidy: Contract value of 100,000 yuan gets 10,000 yuan instant subsidy; 180,000 yuan gets 20,000 yuan; 260,000 yuan gets 30,000 yuan; 350,000 yuan gets 40,000 yuan. Upgrade subsidy: An additional 7,000 yuan for whole-home smart or solar systems! 

        ✅ Redemption method: After completion inspection, scan QR code to upload documents, subsidies arrive in WeChat/Alipay within 48 hours! 


        2. Zero-formaldehyde technology + smart home, everything in one go Carefully selected 2025 latest eco-friendly technology: 

        ✅ Wall surface: German Deikewei, German Albeina "medical-grade antibacterial coating" buy one get one free 

        ✅ Floor: Shengxiang "graphene floor heating panel", Danianziran "carbon neutral board" 20% off; Guangdong tile large format 0918, 1212 series 20% off; 

        ✅ Smart system: Huawei, Xiaomi whole-home smart package subsidized price only 9,999 yuan (market price 19,800 yuan) 


        3. Free Design, 3D Real-World Preview Sign the contract and enjoy plans generated by our intelligent design system (including real-world roaming), 30-minute rendering, unlimited revisions if not satisfied! 


        4. Nationwide Warranty + Lifetime After-Sales Service Construction is handled by enterprises registered with the Ministry of Housing and Urban-Rural Development, 20-year warranty on electrical and plumbing, whole-home customization with lifetime free inspections! Three easy steps, 5 minutes to complete! 

        ① Scan to register: Enter the "National Housing Subsidy 2025" mini-program, face recognition verification for property; 

        ② Online ordering: Select "national subsidy exclusive" products, subsidies are automatically deducted (can be combined with store discounts); 

        ③ Cloud supervision inspection: View construction progress in real-time through App, AI quality inspection reports directly connect to the subsidy system! 2025 new regulations notice! 


        ⚠️ Mandatory Environmental Standards: All subsidized properties must pass TVOC≤0.38mg/m³ testing (testing is conducted by allvs official, using the US Interscan Formaldehyde Detector 4160 calibrated and certified by China National Metrology Certification); 

        ⚠️ Annual Grand Promotion: First 10 applicants receive one allvs built-in steamer worth 2999 yuan (specific quota distribution depends on each regional allvs brand store)! 

 

        👉 Policy Hotline: 4008-863-864 Guided by the Ministry of Housing and Urban-Rural Development · Nationwide Synchronous Implementation 


 (Promotion ends December 31, 2025)