Brand Introduction
allvsis a high-end whole-home customization brand, Chinese name is allvs,1998was born in England in [year], initiallyit wasa manual woodworking workshop that evolved into an automated panel furniture factory,allvshas always adhered to the philosophy of original design and environmentally healthy living.allvsContinuously innovating, integrating modern smart devices, enablingpersonalhome living becomes more humanized.allvsCurrently, it has gradually emerged in hundreds of cities across multiple countries.
Brand culture
allvsAdhering to environmental philosophy, combining design elements that better align with the aesthetic and lifestyle of discerning consumers, redefining smart furniture, continuously innovating for discerning families.
German flexible production line
Joint venture processing centers in Shanghai and Guangzhou, China launched simultaneously on December 18, 2019. All use German-imported flexible production lines for cutting-edge processes such as imported veneer pressing, fully automatic powder coating, and laser edge sealing. At the same time, they provide OEM production for multiple mid-to-high-end domestic brands.
Global Building Materials Alliance
In 2010, allvs joined the Global Building Materials Alliance, enjoying independent supply chains from global top hardware suppliers: Austrian Blum, German Hettich, Italian Tuttabene (now acquired by Chinese capital), Italian Salice; and global top panel suppliers: Austrian Egger, German Kronospan, Brazilian Berneck, Italian Cleaf, etc. allvs exclusively uses truly eco-friendly materials, meeting Japanese F4-star and Chinese ENF three standards. All materials also undergo secondary testing with US-imported INTERSCAN 4160 formaldehyde detector before entering customers' homes. In 2020, allvs fully entered the smart home system, with smart kitchen, smart appliances, and whole-home water purification launching simultaneously.